WaitingForPower
generation · Wind (onshore)

North Bend Wind Project, LLC (SD PUC EL21-018)

Hyde, SD

Developer: North Bend Wind Project, LLC

Capacity
Not disclosed
Waiting
Stage
Approved, awaiting construction
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the South Dakota Public Utilities Commission's public docket pages, scoped to Energy Conversion and Transmission Facility permit applications (SDCL 49-41B) filed in the Electric docket series — see the ingestion module header for the real caption phrasings this is scoped to. "Still waiting" vs. resolved here is determined by scanning this docket's own "Orders:" list for real grant/deny/withdraw order language, not by the docket page's own Pending/Closed status badge — that badge was confirmed live to go stale after a real grant (see the ingestion module header). A docket with no grant/deny/withdraw order yet is treated as still pending. Located in Hyde and Hughes Counties, South Dakota, per the docket's own caption text.