generation · Gas

LES for two fifty-two (52) megawatt aero derivate dual fuel combustion turbines (NE PRB PRB-4057-G)

NE

Developer: LES for two fifty-two (52) megawatt aero derivate dual fuel combustion turbines

Capacity
Not disclosed
Waiting
Stage
Approved, awaiting construction
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the Nebraska Power Review Board (NPRB/PRB) — the state agency with sole statutory authority (Neb. Rev. Stat. §§70-1010 to 70-1014.01) to approve new electric generation facilities, out-of-service-area transmission lines, and (since 2024) standalone energy storage resources, since Nebraska has no investor-owned electric utilities and no Public Service Commission jurisdiction over electric-utility certificates the way most states in this series have. The PRB publishes no case-search tool or pending-docket database; "still waiting" here is inferred entirely from the Board's own public meeting minutes, which record each application's filing, discussion, and vote — often, but confirmed not always, within the same monthly meeting. See the ingestion module header for how this was calibrated, including a confirmed real multi-month case and a confirmed real transcription typo in the Board's own minutes. No structured location field is published; this project will not appear on the map until geocoded another way.