storage · Storage
Bridge Solar Energy Development I, LLC (Bridge Solar) and the Lincoln Electric System (LES) (NE PRB PRB-4052-ESR)
Developer: Bridge Solar Energy Development I, LLC (Bridge Solar) and the Lincoln Electric System (LES)
Capacity
3 MW
Waiting
—
Stage
Approved, awaiting construction
Verification
Verified (primary source)
Estimated investment waiting
$3.9M
≈ 3,000 kW × $1,316/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: Sourced from the Nebraska Power Review Board (NPRB/PRB) — the state agency with sole statutory authority (Neb. Rev. Stat. §§70-1010 to 70-1014.01) to approve new electric generation facilities, out-of-service-area transmission lines, and (since 2024) standalone energy storage resources, since Nebraska has no investor-owned electric utilities and no Public Service Commission jurisdiction over electric-utility certificates the way most states in this series have. The PRB publishes no case-search tool or pending-docket database; "still waiting" here is inferred entirely from the Board's own public meeting minutes, which record each application's filing, discussion, and vote — often, but confirmed not always, within the same monthly meeting. See the ingestion module header for how this was calibrated, including a confirmed real multi-month case and a confirmed real transcription typo in the Board's own minutes. No structured location field is published; this project will not appear on the map until geocoded another way.