WaitingForPower
transmission · Transmission

AEP Dennison-Yager 138 kV Transmission Line Rebuild Project (OH OPSB Case 16-0534-EL-BTX)

Tuscarawas, OH

Developer: AEP Ohio Transmission Company

Capacity
Not disclosed
Waiting
Stage
Under construction
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the Ohio Power Siting Board's public case list. Located in Tuscarawas County, Ohio, per OPSB — no structured coordinates are published, so this project will not appear on the map until geocoded another way.