WaitingForPower
generation · Wind (onshore)

Top of the World Windpower Project (WY ISC Docket 2009-03)

WY

Capacity
Not disclosed
Waiting
Stage
Approved, awaiting construction
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the Wyoming DEQ Industrial Siting Council's public docket archive (a Google Drive folder the agency's own website links to). No structured status field exists in this source; "still waiting" is inferred from whether the docket's own folder contains a document with "Order" in its filename — see the ingestion module header for how this was calibrated. Capacity is not stated anywhere in this source's folder or document titles and was not independently parsed from the underlying application PDFs, so no capacity figure is available for this project. No structured location field is published; this project will not appear on the map until geocoded another way.