Capacity
240 MW
Waiting
—
Stage
Approved, awaiting construction
Verification
Verified (primary source)
Estimated investment waiting
$318.5M
≈ 240,000 kW × $1,327/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.
Public Hearings
Unknown
Hearing details: Unknown
Not available from this project’s data source yet. Check the sources below directly.
Sources
Data quality note: Sourced from the New York Department of Public Service's public Document and Matter Management system, Article VIII of the New York Public Service Law / its predecessor Executive Law § 94-c (major renewable energy facility siting). This system does not publish a case/matter "Status" field at all; "still waiting" here is inferred from scanning every publicly filed document's title for a granting/denying determination — see the ingestion module header for how this was calibrated, including a track-specific gotcha (renewable-siting grants are filed as plain correspondence, not as an Order or Decision document type). Capacity figure is parsed from the docket title text, not a structured field — not independently verified. No structured location field is published; this project will not appear on the map until geocoded another way.