WaitingForPower
generation · Solar

PASADENA PEMBERTON SOLAR FARM, LLC (NJ BPU Docket QW26040166)

NJ

Developer: PASADENA PEMBERTON SOLAR FARM, LLC

Capacity
Not disclosed
Waiting
Stage
Cancelled
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the New Jersey Board of Public Utilities' public docket search (publicaccess.bpu.state.nj.us), seeking a waiver of the Competitive Solar Incentive (CSI) Program's siting prohibitions (N.J.A.C. 14:8-12), required before the project can participate in the CSI incentive solicitation. NJ BPU's own docket "Case Status" field was found stale/unreliable in testing (a docket with a Final Order granting the petition nearly nine years ago still read "UNDER REVIEW"); "still waiting" here is instead inferred by fetching the docket's most recent Board Order document and scanning its actual text for a granting/denying disposition -- see the ingestion module header for how this was calibrated against real, independently-verified dockets. No lat/lon geocoding -- state-docket sources are not geocoded in this series (a known deferred gap). Capacity was not stated in the docket caption and could not be determined. No structured location field is published and none could be parsed from the docket caption.