WaitingForPower
transmission · Transmission

NextEra Energy Transmission New York, Inc (NY DPS Case 18-T-0499)

Niagara, Erie, NY

Developer: NextEra Energy Transmission New York, Inc

Capacity
Not disclosed
Waiting
Stage
Approved, awaiting construction
Verification
Verified (primary source)

Estimated investment waiting

Not estimated: Investment-waiting is only estimated for projects with capacity measured in MW (generation/storage). This project's capacity is measured differently (e.g. MTPA, or pipeline length/diameter).

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the New York Department of Public Service's public Document and Matter Management system, Article VII of the New York Public Service Law (major transmission facility siting). This system does not publish a case/matter "Status" field at all; "still waiting" here is inferred from scanning every publicly filed document's title for a granting/denying determination — see the ingestion module header for how this was calibrated, including a track-specific gotcha (renewable-siting grants are filed as plain correspondence, not as an Order or Decision document type). Located in Niagara, Erie County, New York, per the docket title — no structured coordinates are published, so this project will not appear on the map until geocoded another way.