High Bridge Wind, LLC (NY DPS Case 18-F-0262)

Chenango, NY

Developer: High Bridge Wind, LLC

Capacity
100 MW
Waiting
Stage
Approved, awaiting construction
Verification
Verified (primary source)

Estimated investment waiting

$171.8M

100,000 kW × $1,718/kW typical overnight construction cost (EIA) — the dollar value of the power plant itself sitting in permitting limbo, not a bill estimate. Full methodology.

Public Hearings

Unknown

Hearing details: Unknown

Not available from this project’s data source yet. Check the sources below directly.

Sources

Data quality note: Sourced from the New York Department of Public Service's public Document and Matter Management system, Article VII of the New York Public Service Law (major transmission facility siting). This system does not publish a case/matter "Status" field at all; "still waiting" here is inferred from scanning every publicly filed document's title for a granting/denying determination — see the ingestion module header for how this was calibrated, including a track-specific gotcha (renewable-siting grants are filed as plain correspondence, not as an Order or Decision document type). Capacity figure is parsed from the docket title text, not a structured field — not independently verified. Located in Chenango County, New York, per the docket title — no structured coordinates are published, so this project will not appear on the map until geocoded another way.